5.
|
JV HDGSK ( Hundayi Co., GSE Co. & SK
Co.).
|
Karbala Refinery Project PKG 7
|
Karbala/Iraq
|
Sep/2015-May2018
|
58%
|
6.
|
JV HDGSK ( Hundayi Co., GSE Co. & SK
Co.).
|
Karbala Refinery Project PKG 8
|
Karbala/Iraq
|
April/2016-July2018
|
45%
|
7.
|
General Directorate of Water / Ministry
of Municipalities & Public Works
|
·
Design and construction of AL-SALAM &
AL-MANSOURIYA Water Treatment Plant
of
88,000m3/day composed of:
·
Intake structure
·
Low lift pump house
·
Flash mixer
·
Four clarifiers of 38m diameter
·
Twenty Filters of 40m2 area
each
·
Two concrete storage tank of 8,000m3
each
·
Two High lift Pump houses
·
Three Power buildings
·
Sludge pit 500m3 capacity
·
Chemical building
·
Workshop building
·
Admin building
·
3 operator houses
·
Engineer house
·
3 guard rooms
·
Fences
·
Elevated steel tank of 25m height and
1100m3 capacity
·
Transmission lines
§
Ductile pipe (double flange) Ø700mm,
length 350m.
§
Ductile pipe Ø500mm, length 300m.
§
Ductile pipe Ø1000mm, length 1250m.
§
Ductile pipe Ø600mm, length 12,800m.
§
Ductile pipe Ø900mm, length 27,600m.
§
Ductile pipe Ø500mm, length 4,000m.
§
Ductile pipe Ø300mm, length 1,000m.
§
Ductile pipe Ø700mm, length 13,400m.
§
Ductile pipe Ø500mm, length 4,200m.
§
Ductile pipe Ø800mm, length 500m.
|
Dyala / Iraq
|
Jan. 2013 – May 2017
|
52%
|
8.
|
General Directorate of Water / Ministry
of Municipalities & Public Works
|
·
Design and construction of AL-SADA & AL-GOBOR
Water Treatment Plant
of
44,000m3/day composed of:
·
Intake structure
·
Low lift pump house
·
Flash mixer
·
Three clarifiers of 34m diameter
·
Ten Filters of 40m2 area each
·
One concrete storage tank of 4,000m3
·
High lift Pump house
·
Two Power buildings
·
Sludge pit 400m3 capacity
·
Chemical building
·
Workshop building
·
Admin building
·
3 operator houses
·
Engineer house
·
3 guard rooms
·
Fences
·
Elevated steel tank of 25m height and
900m3 capacity
·
Transmission lines
§
Ductile Iron Pipe of 8km Ø500mm
§
Ductile Iron Pipe of 1.5km Ø250mm
§
Ductile Iron Pipe of 5.5km Ø400mm
§
Ductile Iron Pipe of 1.65km Ø700mm
§
Ductile Iron Pipe of 1.5km Ø500mm
|
Dyala / Iraq
|
Sep. 2012 – March. 2017
|
66%
|
9.
|
State Company for Oil Projects SCOP
|
Design and construction of Muftiya WTP
2x1000m3/h, Basrah / Iraq
(Turnkey)
The contract includes design & supply of
the following (all pile foundation)
·
Low lift pump house with suction well
·
Intake structure with sheet pile in Shat
Al-Arab
·
Two flash mixers
·
Four clarifiers Ø27m
·
Two intermediate pump houses
·
Twenty pressure filters Ø2.4×6.5m
·
Two steel storage tank of 5,000m3
·
Diesel pump house
·
Power house 2x600kVA diesel generator
·
Two Sludge pits 400m3
capacity
·
Two chemical buildings
·
Two workshop buildings
·
Admin & control building
§
Two R.O. units 5m3/day
|
Basra / Iraq
|
Mar/2010 – March/2017
|
100%
|
10.
|
Water Directorate / Ministry of
Municipalities & Public Works
|
Design and construction of Hawija WTP
3000m3/h, Kirkuk / Iraq
(Turnkey)
The contract includes design & supply of
the following (all pile foundation)
·
Low lift pump house with suction well
·
One flash mixer with receiving well
·
Three clarifiers Ø34m
·
Ten filters 40m2 each
·
Underground concrete storage tank of
4,000m3
·
Power house diesel generator
·
Sludge pits
·
Chemical building
·
Workshop building
·
Admin & control building
·
Two elevated (25m) steel storage tanks
(½ & ¼ MG)
·
Laying water pipelines Ø500mm L3500m &
Ø600mm L5500m
·
Supply & installations of all mechanical
& electrical & control equipment
|
Hawija / Iraq
|
Dec. 2008 – Oct. 2010
|
100%
|
11.
|
Ministry of Higher Education
|
Agriculture College, Babil University,
21 Building Complex, total area 28,000m2
|
Babil / Iraq
|
May 2008 – Jun 2010
|
100%
|
12.
|
Babil Governorate
|
Design, supply all construction
materials for village service road of
29,100m for Babil Governorate. The
project is composed of earth works, 25cm
sub-base coarse, 10cm asphaltic concrete
and 9 pipe culverts
|
Babil / Iraq
|
Feb. 2007 – Apr. 2008
|
100%
|
13.
|
General Directorate for Water / Ministry
of Municipality and Public Works
|
Design and construct elevated steel tank
of 500,000 Gallon capacity, Supply &
installation & testing & operation of
the elevated steel tank.
|
Abu Ghraib / Iraq
|
Dec. 2002 – Aug. 2003
|
100%
|
14.
|
General Corporation for Water & Sewage (GCWS)
/ Ministry of Municipality and Public
Works
|
·
Design and construction of Abu Graib
Water Treatment Plant
WTP of
22,000m3/day composed of:
·
Two clarifiers of 26m diameter
·
One concrete storage tank of 2,000m3
·
Ten Filters of 40m2 area each
·
Pump house
·
Flash mixer
·
Receiving well 200m3 capacity
·
Power house 900kVA diesel generator.
·
Sludge pit 100m3 capacity
·
Chemical building
·
Workshop building
·
Transmission line
·
Ductile Iron Pipe of 5.5km Ø600mm
·
Elevated steel tank of 25m height and
½Million Gallon capacity
|
Abu Ghraib / Iraq
|
Dec. 2001 – Aug. 2002
|
100%
|
15.
|
State Commission for Maintenance of
Irrigation Projects / Ministry of
Irrigation
|
Construction of embankments and box
culverts in south of Al-Qaim town to
protect Al-Qaim town from rains
|
Al-Qaim / Iraq
|
Aug. 2001 – Apr. 2002
|
100%
|
16.
|
Water Directorate / Ministry of
Municipalities & Public Works
|
Al-Thulueiya Irrigation Project, Design
& Construct irrigation Concrete
channels, concrete regular box culverts
and care bridge
|
Thulueiya / Iraq
|
May 2000 – Oct. 2002
|
100%
|
17.
|
Ministry of Irrigation
|
Survey, design and earth work embankment
of (4.5 – 5m) average height and (18 –
20m) width of 12,660m village road will
all the pipes and box culverts
|
Missan / Iraq
|
Feb. 2000 – Jan. 2002
|
100%
|
18.
|
Salah Al-Deen Governorate
|
Supply all the construction materials to
contract 8 military stores of
24.4mx50.8m and 8m height with all the
electrical installation and water
networks in Tikreet Camp
|
Salah- Al-Deen / Iraq
|
Jan. 2000 – Oct. 2000
|
100%
|
19.
|
Nineveh Governorate
|
Supply all the construction material,
earth works, 30cm sub-base coarse and
20cm asphalt paving of 9,850m road to
Al-MeshrakSulphure Company
|
Mosul / Iraq
|
Aug. 1999 – Jan. 2001
|
100%
|
20.
|
Planning Committee / Ministry of
Planning
|
Supply all the asphaltic material needed
for paving 21 KM asphaltic concrete
binder and surface layer for roads in
Al-Karkh side for planning committee
|
Baghdad / Iraq
|
Aug. 1999 – Jan. 2000
|
100%
|
21.
|
General Corporation for water & sewerage
(GCWS) / Ministry of Municipality and
Public Works
|
Tikret Sewerage Project. Design & supply
all the concrete pipes of diameter
1,800mm for main sewage sewers with 32
manholes of height (2.00 – 6.5m)
including repaving the roads with
asphaltic concrete
|
Salah Al-Deen / Iraq
|
Mar. 1999 – Aug. 2000
|
100%
|
22.
|
State Organization for Roads and Bridges
/ Ministry of Housing and Construction
|
Survey, design and construct earth works
and sub-base of 44,000m road between
Emara and Al-Azear including pipe and
box culverts
|
Missan / Iraq
|
Sep. 1998 – Feb. 2001
|
100%
|
23.
|
Ministry of Irrigation
|
Survey and design for embankment earth
works of (3.8 – 4.3m) height and 22 –
25m) wide of 10,330m road to AL-Sakhriga
village will all the pipes and box
culverts
|
Al-Sakhriga / Iraq
|
Oct. 1998 – Jul. 1999
|
100%
|