Completed Duration Location Scope of project Contact details Customer
#

100%

Jul/2009 – Apr 2010


Najaf / Iraq


Supply of line pipes, pipe fitting, valves
and crossing materials for Al-Najaf Depot
Project (ECP Project)

Ministry of Oil

SCOP

1

100%

Apr/2010 – Dec/2010


Samawa / Iraq


Supply of line pipes, pipe fitting, valves
and crossing materials for Al-Samawa
Refinery (ECP Project)

Ministry of Oil

SCOP
2

100%

Nov/2009 – Dec/2010


Basra / Iraq


Design & supply of 9 steel tanks of
25,000m3, 10,000m3 and 7,000m3 capacities
for oil products

Ministry of Oil

SRC
3

100%

May.2011- Jan. 2012


South Refinery-Basrah


execution of environmental impact Assessment
(EIA) for upgrading FCC project in Basrah
Refinery, include Topographical and Site
Survey, EIA Study

Ministry of Oil

SRC
4

100%

Mar/2008 – May/2011


North Iraq


Design & supply & supervision for 3 oily
waste water treatment plants for 3
refineries

Ministry of Oil

NRC
5

100%

May/2008 – Jun/2010


Babil / Iraq


Agriculture College,Babil University,21
Building Complex, total area 28,000m2

MHE

MHE
6

100%

Jul/2009 – Dec/2012


Basra / Iraq


Design, supply, & installation of 7 LPG
tanks of 200 m3 capacities

Ministry of Oil

SRC
7

100%

Dec/2004 – Oct /2010


Hawija / Iraq


Design and construction of Hawija WTP
44000m3/day, Kirkuk / Iraq (Turnkey)
The contract includes design & supply of the
following (all pile foundation)
– Low lift pump house with suction well
– One flash mixer with receiving well
– Three clarifiers Ø34m       – Ten filters
40m2 each
–  Underground concrete storage tank of
4,000m3
– Power house diesel generator
–  Sludge pits                     –
Chemical building
– Workshop building          – Admin &
control building
– Two elevated (25m) steel storage tanks (½
& ¼ MG)
–  Laying water pipelines Ø500mm L3500m &
Ø600mm L5500m
–  Supply & installations of all mechanical
& electrical & control equipment

MMPW

Water Directorate
8

100%

Dec/2009 – Jun/2010
Najaf / Iraq
Supply of ERW, LSAW Line Pipes, fittings and
accessories

Ministry of Oil

SCOP
9

100%

Feb/2007 – Apr/2008
Babil / Iraq
Design, supply all construction materials
for village service road of 29,100m for
Babil Governorate. The project is composed
of earth works, 25cm sub-base coarse, 10cm
asphaltic concrete and 9 pipe culverts

Babil Governorate

Babil Gov.
10

100%

Dec/2002 – Aug/2003

Abu
Ghraib / Iraq


Design and construct elevated steel tank of
500,000 Gallon capacity, Supply &
installation & testing & operation of the
elevated steel tank.

Bab Al-Muadham / Medan Square

General Directorate for Water / Ministry of
Municipality  and Public Works
11

100%

Aug/2001 – Apr/2002
Al-Qaim /
Iraq

Construction of embankments and box culverts
in south of Al-Qaim town to protect Al-Qaim
town from rains

Ministry of Irrigation

State Commission for Maintenance of
Irrigation Projects
12

100%

Feb/2000 – Jan2002

Missan
/ Iraq


Survey, design and earth work embankment of
(4.5 – 5m) average height and (18 – 20m)
width of 12,660m village road will all the
pipes and box culverts

Palestine Street –Baghdad –Iraq

Ministry of Irrigation
13

100%

Aug/1999 – Jan/2001

Mosul
/ Iraq


Supply all the construction material, earth
works, 30cm sub-base coarse and 20cm asphalt
paving of 9,850m road to Al-MeshrakSulphure
Company

Nineveh Governorate Building, Al-Mosul –
Iraq

Nineveh Governorate
14

100%

Aug/1999 – Jan/2000
Baghdad /
Iraq

Survey, design and earth work embankment of
(4.5 – 5m) average height and (18 – 20m)
width of 12,660m village road will all the
pipes and box culverts

Ministry of Planning Build Baghdad – Iraq

Planning Committee
15

100%

Sep/1998 – Feb/2001
Missan /
Iraq

Supply all the construction material, earth
works, 30cm sub-base coarse and 20cm asphalt
paving of 9,850m road to Al-MeshrakSulphure
Company

MHE

State Organization for Roads and Bridges
16

100%

Oct/1998 – Jul/1999
Al-Sakhriga
/ Iraq

Survey, design and construct earth works and
sub-base of 44,000m road between Emara and
Al-Azear including pipe and box culverts

Palestine Street –Baghdad –Iraq

Ministry of Irrigation
17
100% Jan/2000 – Oct/2000
Salah-Al-Deen / Iraq
Supply all the construction materials to
contract 8 military stores of 24.4mx50.8m
and 8m height with all the electrical
installation and water networks in Tikreet
Camp
Salah Al-Deen Governorate Building
Tikreet – Iraq
Salah Al-Deen Governorate 18

100%

Dec/2001 – Aug/2002
Abu Ghraib /
Iraq

Design and construction of Abu Graib Water
Treatment Plant WTP of 22,000m3/day composed
of:
– Two clarifiers of 26m diameter
– One concrete storage tank of 2,000m3
– Ten Filters of 40m2 area each
– Pump
house                                  –
Flash mixer
– Receiving well 200m3 capacity      
– Power house 900kVA diesel generator.
– Sludge pit 100m3 capacity            –
Chemical building
– Workshop building                        –
Transmission line
– Ductile Iron Pipe of 5.5km Ø600mm
– Elevated steel tank of 25m height and
½Million Gallon capacity

Bab Al-Muadham / Meedan Square
MMPW

General Corporation for Water & Sewage (GCWS)
19

100%

Sep/2000 – Sep/2001

Basra
/ Iraq

Construction of fuel storage tanks
foundations for Strategic Project Supply all
concrete needed for the foundation for the
storage tanks in 3groups in Basra / Fao –
Basra Governorate of a capacity of 5000m3
(2×2000m3 + 1×1000m3) tanks, the work
includes all the earth works and sub-base
layers of 90cm thick


Basra Governorate Building / Basra/ Iraq

Basra Governorate
20

100%

May/2000 – Oct/2002
Thulueiya/
Iraq

Al-Thulueiya Irrigation Project, Design &
Construct irrigation Concrete channels,
concrete regular box culverts and care
bridge

MMPW

Water Directorate
21

100%

Mar/1999 – Aug/2000
Salah Al-Deen
/ Iraq

Tikret Sewerage Project. Design & supply all
the concrete pipes of diameter 1,800mm for
main sewage sewers with 32 manholes of
height (2.00 – 6.5m) including repaving the
roads with asphaltic concrete

Bab Al-Muadham / Meedan Square MMPW

General Corporation for Water & Sewage (GCWS)
22

100%

Jun./2009- Dec./2009
Zubair South
& North Rumila
Field instruments for degassing station
Ministry of Oil

SOC
23

100%

Sep./2009- Mar./2010

North
Oil Company

Supplying cables & junction boxes
Ministry of Oil

NOC
24

100%

Oct./2009 – Feb./2010
North Oil
ompany
supplying field instruments for gas
compressor stations / AB-1, 3 & 8

Ministry of Oil

NOC
25

100%

Mar/2010 – March/2017

Basra / Iraq

Design and construction
of Muftiya WTP 2x1000m3/h, Basrah / Iraq
(Turnkey)
The contract includes design & supply of the
following (all pile foundation)
·  Low lift pump house with suction well
·  Intake structure with sheet pile in Shat
Al-Arab
·  Two flash mixers
·  Four clarifiers Ø27m
·  Two intermediate pump houses
·  Twenty pressure filters Ø2.4×6.5m
·  Two steel storage tank of 5,000m3
·  Diesel pump house
·  Power house 2x600kVA diesel generator
·  Two Sludge pits 400m3 capacity
·  Two chemical buildings
·  Two workshop buildings
·   Admin & control building §  Two R.O.
units 5m3/day

  SCOP 26

100%

Dec. 2008 – Oct. 2010

Hawija / Iraq

Design and construction of Hawija WTP
3000m3/h, Kirkuk / Iraq (Turnkey)
The contract includes design & supply of the
following (all pile foundation)
·   Low lift pump house with suction well
·   One flash mixer with receiving well
·   Three clarifiers Ø34m
·   Ten filters 40m2 each
·   Underground concrete storage tank of
4,000m3
·   Power house diesel generator
·   Sludge pits
·   Chemical building
·   Workshop building
·   Admin & control building
·   Two elevated (25m) steel storage tanks
(½ & ¼ MG)
·    Laying water pipelines Ø500mm L3500m &
Ø600mm L5500m
·    Supply & installations of all
mechanical & electrical & control equipment

Water Directorate /
Ministry of Municipalities & Public Works

  27

100%

May 2008 – Jun 2010

Babil / Iraq

Agriculture College, Babil University, 21
Building Complex, total area 28,000m2

Ministry of Higher Education
 MHE 28

100%

Feb. 2007 – Apr. 2008

Babil / Iraq

Design, supply all construction materials
for village service road of 29,100m for
Babil Governorate. The project is composed
of earth works, 25cm sub-base coarse, 10cm
asphaltic concrete and 9 pipe culverts

Babil Governorate

Babil Governorate

29

100%

Dec. 2002 – Aug. 2003

Abu Ghraib /
Iraq

Design and construct elevated steel tank
of 500,000 Gallon capacity, Supply &
installation & testing & operation of the
elevated steel tank.


General Directorate for Water / Ministry of
Municipality and Public Works
  30

100%

Dec. 2001 – Aug. 2002
Abu Ghraib /
Iraq
·         Design and construction of Abu
Graib Water Treatment Plant WTP of
22,000m3/day composed of:
·      Two clarifiers of 26m diameter
·      One concrete storage tank of 2,000m3
·      Ten Filters of 40m2 area each
·      Pump house
·      Flash mixer
·      Receiving well 200m3 capacity
·      Power house 900kVA diesel generator.
·      Sludge pit 100m3 capacity
·      Chemical building
·      Workshop building
·      Transmission line
·      Ductile Iron Pipe of 5.5km Ø600mm
·      Elevated steel tank of 25m height and
½Million Gallon capacity

General Corporation for Water & Sewage (GCWS)
/ Ministry of Municipality and Public Works
  31

100%


Aug. 2001 – Apr. 2002
Al-Qaim /
Iraq

Construction of embankments and box
culverts in south of Al-Qaim town to protect
Al-Qaim town from rains


State Commission for Maintenance of
Irrigation Projects / Ministry of Irrigation
  32

100%

May 2000 – Oct. 2002
Thulueiya /
Iraq
Al-Thulueiya Irrigation Project, Design &
Construct irrigation Concrete channels,
concrete regular box culverts and care
bridge

Water Directorate / Ministry of
Municipalities & Public Works
  33

100%

Feb. 2000 – Jan. 2002
Missan /
Iraq
Survey, design and earth work embankment
of (4.5 – 5m) average height and (18 – 20m)
width of 12,660m village road will all the
pipes and box culverts

Ministry of Irrigation

Ministry of Irrigation
34

100%

Jan. 2000 – Oct. 2000
Salah- Al-Deen
/ Iraq
Supply all the construction materials to
contract 8 military stores of 24.4mx50.8m
and 8m height with all the electrical
installation and water networks in Tikreet
Camp

Salah Al-Deen Governorate

Salah Al-Deen Governorate
35

100%

Aug. 1999 – Jan. 2001
Mosul / Iraq

Supply all the construction material,
earth works, 30cm sub-base coarse and 20cm
asphalt paving of 9,850m road to Al-Meshrak
Sulphure Company


Nineveh Governorate

Nineveh Governorate
36

100%


Aug. 1999 – Jan. 2000
Baghdad /
Iraq

Supply all the asphaltic material needed
for paving 21 KM asphaltic concrete binder
and surface layer for roads in Al-Karkh side
for planning committee


Planning Committee / Ministry of Planning

Ministry of Planning
37

100%

Mar. 1999 – Aug. 2000

Salah Al-Deen
/ Iraq

Tikret Sewerage Project. Design & supply
all the concrete pipes of diameter 1,800mm
for main sewage sewers with 32 manholes of
height (2.00 – 6.5m) including repaving the
roads with asphaltic concrete


General Corporation for water & sewerage (GCWS)
/ Ministry of Municipality and Public Works

Ministry of Municipality and Public Works
38

100%


Sep. 1998 – Feb. 2001
Missan /
Iraq

Survey, design and construct earth works
and sub-base of 44,000m road between Emara
and Al-Azear including pipe and box culverts


State Organization for Roads and Bridges /
Ministry of Housing and Construction

Ministry of Housing and Construction
39

100%

Oct. 1998 – Jul. 1999

Al-Sakhriga
/ Iraq

Survey and design for embankment earth
works of (3.8 – 4.3m) height and 22 – 25m)
wide of 10,330m road to AL-Sakhriga village
will all the pipes and box culverts


Ministry of Irrigation

Ministry of Irrigation
40


SCOP :

State Company for Oil Projects


SRC   : 

South Refineries Company.


NRC  :  

North Oil Company.    


MHE :
Ministry of Higher Educatio
MMPW: 
     Ministry of Municipality &
Public Works.